top1a
top2b
 

Vashon Transfer/Recycling Station

King County, Washington
 

Related Projects

Tongue Point Job Corps Center Water System Design and Seawall Subsidence Study

Yermo Water Line Replacement Design

Oak Vale II Water System 1994 Update

McGregor Park Potable Water System Supply Study

Keller Water System Design

Rager Ranger Station Water System Design

 

Description

Thomas/Wright, Inc., serving as the prime consultant, completed the conceptual level design and site selection process for a transfer/recycling station to replace the Vashon Island Landfill which closed in 1999.

Thomas/Wright, Inc. completed the plans and specifications for the transfer/recycling station. On-site improvements included access roads, water storage tanks and pumps for fire flow protection, an on-site wastewater disposal system, stormwater facilities, a new fueling station, a standby generator, and landscaping. The facility also includes a new scalehouse and scales.

T/WI provided contract administration during construction.

 
Home | About Us | Services | Projects | Jobs | Contact Us
Thomas/Wright, Inc.