|
||||||||
![]() |
||||||||
|
||||||||
|
Description |
||||||||
|
T/WI prepared the plans for the replacement of the water system at the US Forest Service's Rager Ranger Station in the Ochoco National Forest, approximately 85 miles east of Prineville, Oregon. The project was divided into Phases 1, 2 and 3. The new water system includes new 4", 6", and 8" water mains, water service connections to approximately 20 structures, a new well house and new well pump controls. In addition, the design replaces the existing water reservoir with a new 60,000 gallon water storage tank. |
||||||||
| Home | About Us | Services | Projects | Jobs | Contact Us |
| Thomas/Wright, Inc. |