Thomas/Wright, Inc. prepared engineering plans and specifications for the pavement milling and repaving of the existing asphalt pavement surface for Runway 3R/21L. The project includes the removal and replacement of approximately 112,000 square feet of existing asphalt runway pavement, the removal of the build-up of rubber from the surface, repairing the spalls and damaged Portland cement concrete slabs, seal coating the runway overruns, and restriping runway markings. The project also includes topographic surveying and mapping and cost estimates in the SUCCESS format. |
||||||||