McGregor Park Potable Water System Supply Study

Jackson County, Oregon
 

Related Projects

Tongue Point Job Corps Center Water System Design and Seawall Subsidence Study

Yermo Water Line Replacement Design

Oak Vale II Water System

Keller Water System Design

Vashon Transfer/Recycling Station

Rager Ranger Station Water System Design

 

Description

Thomas/Wright, Inc. investigated and evaluated three alternatives for supplying water to McGregor Park for the U.S. Army Corps of Engineers, Portland District.

The alternatives include constructing 2,600 feet of water line in order to connect the Park into an existing well; upgrading the abandoned water treatment plant; and continuing to supply water to the Park by contracting with the local water supplier to bring water to the Park in a tanker truck.

A recommendation was made and an evaluation report was prepared.

 