Durham Advanced Wastewater Treatment Plant Solids Building HVAC and Foul Air/Odor Control

Durham, Oregon
 

Related Projects

Replace Potable Water Piping at Buildings 1-3, 7 & 8 at SPAWAR OTC

Naval Air Station North Island Pump Station Study

Pump Stations Equipment Retrofit

HVAC for Pump Stations

Zigzag Ranger Station HVAC Improvements Design/Build

 

Description

Thomas/Wright, Inc., as a subconsultant to HDR, was responsible for the HVAC and odor control improvements to the Solids Handling Building.

T/WI prepared a technical memorandum for the HVAC system in the solids handling building. The memorandum included a review of the existing system, design criteria, a summary of the exhaust air flow rates from odor producing spaces, and a preliminary design for improvements.

The technical memorandum for the foul air/odor control included a summary and ranking of odor sources, a review of the existing system, and a preliminary design for a new system. Phase 2 of the project included the preparation of plans and specifications for the recommended improvements.

 