|
Thomas/Wright,
Inc. was the prime consultant for the design of 3,000 feet of multi-use
path and fencing, the restoration of 500 feet of existing path, the
overlay of 1,400 feet of existing path, and five street access
connections. Improvements to the existing path will make it ADA
accessible.
The storm water improvements include bioswales and 925 feet of
storm sewer. Coordinated the work with the structural engineer who
designed a 140-foot long pedestrian bridge over an existing wetland and
the landscape architect. Prepared erosion control plan.
|