|
||||||||
![]() |
||||||||
|
||||||||
|
Description |
||||||||
|
Thomas/Wright, Inc. prepared the plans and specifications for improving the north side of N.E. 76th Street from one block west of 120th Avenue to 127th Avenue. The project includes approximately 1,760 feet of improvements including widening the existing roadway, curbs, gutters, and sidewalks. Storm drain improvements include catch basins and storm sewers, bioswales, and drainage sumps. The project was funded by a Community Development Block Grant. |
||||||||
| Home | About Us | Services | Projects | Jobs | Contact Us |
| Thomas/Wright, Inc. |